Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
525 S Wabash Tower 2
Building
Proposed
2024
Residential / Hotel
23
261
314
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
08 December 2020
COVID-19 has slowed Chicago’s economy, but two bullish developers have drawn up ambitious plans that would bring a combined 1,200 apartments to two city neighborhoods....
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development