You must be a CVU Member to view this resource.
Madison North
100 North High Street
Building
Completed
2026
Residential
All-Concrete
56.2 m / 184 ft
15
1
152
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
04 August 2021
A 13-story apartment building is being proposed for downtown Columbus, as part of a redevelopment of the Ohio capital’s North High Street / Gay Street...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development