This project is a renovation and replaced Shaw Tower (Previous)
You must be a CVU Member to view this resource.
Shaw Tower
Shaw Tower Redevelopment
Building
Completed
2025
Office
154 m / 505 ft
35
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
31 May 2022
Construction has commenced on the new Shaw Tower, which will be redeveloped into a 200-meter future-grade mixed-use tower central to the ongoing rejuvenation of the...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development