You must be a CVU Member to view this resource.
The Legacy at Ann Arbor
616 East Washington Street
Building
Completed
2025
Residential
All-Concrete
63.7 m / 209 ft
19
240
117
Proposed
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
09 October 2019
A 19-story high-rise behind the Michigan Theater in downtown Ann Arbor is headed to City Council. After hearing mostly support from several residents who spoke...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development