You must be a CVU Member to view this resource.
Xinghai Evelyn Tower #2
Yunxing Haijingtai Tower 2
Building
Completed
2021
Residential
99.9 m / 328 ft
33
192
Proposed
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development